Skip to content
+48 573 006 078 info@arbena-group.com
Fabric buildings Request a quote

Buildings / Temporary storage

Temporary warehouse buildings and structures

Add covered warehouse capacity for seasonal stock, a production change or temporary site works. ARBENA designs and installs steel-framed fabric buildings to suit the intended period of use, the handling operation and the site-specific snow and wind actions.

when operations change
Extra space
snow and wind design
Site-specific
length by bays
Modular
assessed individually
Relocation

Extra warehouse capacity without a conventional new-build programme

Temporary describes the operational need, not a lower structural standard. Even a short-term warehouse must be designed for its actual site.

Seasonal stock, renovation works, a logistics change or an unexpected rise in demand can all create a need for additional covered space. A temporary warehouse may be useful for a few months, several seasons or longer, depending on the business plan.

The usable height, access routes, stored goods, site conditions and period of installation all influence the building specification. Where later dismantling is envisaged, the design and anchoring must be reviewed from the start.

White ARBENA arch building on concrete block walls next to waste containers

When a temporary structure makes sense

Seasonal capacity

Create extra space near an existing warehouse during peak demand.

Operations kept accessible

Plan openings and vehicle circulation around the established site.

Different enclosure levels

Choose an open, partly enclosed or enclosed configuration for the goods.

Prepared ground or existing surfaces

Anchoring can be evaluated on a range of supports after technical checks.

Future changes considered early

The modular frame may allow an extension or relocation where technically feasible.

Designed for local loads

Snow and wind actions determine the structural arrangement, even for temporary use.

Technical specifications

Dimensions, performance and potential relocation are confirmed per project. No single specification applies to every temporary storage building.

ParameterSpecification / project information
UseTemporary warehouse, seasonal store or covered logistics area
StructureHX420 steel frame, suitable profiles based on engineering calculations
Steel protectionMagnelis® coating used in current ARBENA systems
SpanSelected for handling operations and site loads; up to 30 m in suitable designs
LengthModular bays, with possible extension subject to checks
Standard coveringPVC/PES reinforced membrane, 670 g/m²
Other covering650 g/m² fire-performance variant where specified and documented
Ground and anchoringPrepared soil, concrete, asphalt or existing walls/blocks if suitable
OpeningsSliding or lifting gates, service doors, open gables as required
Site documentationStructural calculation and project-specific technical information

Standard spans and bay configurations

The building width is selected from the intended layout rather than a nominal floor area. Forklifts, pallet flows, loaders and delivery vehicles determine the required clear opening and usable height. The length may be adjusted by the number of bays.

Installation without permanent foundations

A new concrete slab is not always necessary. Ground anchoring or connection to a suitable existing support may be possible, but must be checked against uplift, lateral loads and the capacity of the substrate.

Planning permission and documentation

A building is not exempt from planning rules simply because it can be dismantled. Requirements differ by country, municipality, duration, size and use. ARBENA can provide technical information; the applicable administrative process must be confirmed locally.

Typical temporary warehouse applications

The required degree of enclosure and the loading operation are more important than the label attached to the building.

Seasonal inventory

Protect stock during demand peaks.

Factory reorganisation

Store parts while internal space is reconfigured.

Logistics overflow

Keep pallets close to a distribution operation.

Renovation works

Provide covered space while a facility is altered.

Agriculture

Shelter crops, feed or machines for a defined period.

Construction sites

Protect materials and equipment.

Covered handling

Create a transfer zone out of the rain.

Staged expansion

Add capacity while a longer-term plan is developed.

Application example: overflow storage during a site change

An operator needs a covered buffer area next to an existing warehouse while renovation or seasonal demand reduces available floor space. The layout is first defined by pallet volumes, the busiest vehicle routes and the condition of the installation surface.

A possible later extension or removal is considered while selecting the frame and anchoring system.

ItemProject detail
Operational needAdditional covered storage
DurationDefined for the project
AccessBased on handling equipment
Span and lengthBased on goods and circulation
SupportAssessed on site
Future useExtension or removal to be considered

How we work, from enquiry to installation

Send the location, intended duration, type of goods, vehicles, dimensions and details of the existing site. We review the structural and anchoring requirements and propose the appropriate openings and enclosures.

The agreed construction is then manufactured, delivered and installed. Actual lead times depend on project scope, site preparation, transport and the installation schedule.

From enquiry to installation

  1. Your brief

    Use, site, dimensions and practical constraints.

  2. Engineering

    Geometry, local loads, anchoring and options.

  3. Manufacture

    Components produced for the approved project.

  4. Installation

    Delivery and assembly according to the agreed programme.

FAQ

Frequently asked questions

Can a temporary warehouse be used for several years?

Yes. “Temporary” describes the initial need rather than a fixed technical lifespan. With suitable design and maintenance, the steel structure can remain in service for several decades, while the membrane may last around 20 years depending on conditions. Anchoring and planning requirements must still be checked for the intended site and period of use.

Is it automatically exempt from planning permission?

No. Administrative requirements depend on local law, intended use, duration and building characteristics.

Can the building later be relocated?

Potentially, but only after reviewing the structural components, anchors, new location and environmental loads.

Does it need permanent concrete foundations?

Not necessarily. Several anchoring methods are possible, subject to calculations and ground assessment. Depending on the project, ground anchoring, concrete, asphalt or suitable wall and block supports may be considered; the anchoring is verified for the site.

How quickly can additional warehouse space be installed?

On-site assembly of smaller ARBENA buildings may take one or two working days in suitable conditions. The full schedule also includes engineering, manufacturing, delivery, site preparation and any permits; larger projects can take much longer. The timetable is agreed for each project.

Request a quote for temporary storage

Share your location, the required period of use, what you plan to store, approximate dimensions and access requirements. If the building may later move, please mention this at the outset.

Request a quote